Manufacture procedure
· CAD drawing
· Prepareing Materials
· Assembling
· Welding
· Polishing
· Sanding Blast&Zinc Spraying
· Adjusting
· Epoxy slurry to fill minor imperfection
· Epoxy primer first time
· Epoxy primer second time
· Acrylic acid black paint
· Hand applied faux finish
· Varnish coat
2
Finish Option
· Dark Copper
· Mediumn Copper
· Light Copper
· Mediumn Sponged
· Gold Rush
· Silver Pewter
· Warm Gold
3
Glass Option
· Clear Glass
· Rain Glass
· Aquatex Glass
· Water Glass
· Water Cubic Glass
· Pebble Glass
· Frosted Glass
· Reeded Glass
4
Packing
· Door panel:packed with EPE, bubble wrap,corrugated paper, polywood case. “glass fragile” and “ this side up” on the crate for the convenience of discharge at your side.
· Door frame: packed with EPE and bubble wrap.
· FCL: the crate will be put in rows and the frame will be put above the crates.
· LCL: the crates and frame will be put into two iron stands for the safety of shipping and the convenience of discharge.
5.Leading Time
· Lead time 1-5 sets: about 25 days
· 1 20ft container: about 30 days.
· 2-3 containers: about 40 days.
· Delivery clause FOB Xiamen